The Lithuania Productive Capacity Authority and Energy Security Act

The Lithuania adaptation - state-owned joint-stock company on the UAB ILTE (Investicijos Lietuvos ekonomikai, the Lithuanian national development bank, formerly INVEGA renamed 30 August 2024) chassis. ENERGY SECURITY as a co-equal Title anchored on the 9 February 2025 Baltic Synchro held at the Vilnius ceremony (Estonia + Latvia + Lithuania disconnection from BRELL and synchronisation with the Continental Europe Synchronous Area via ENTSO-E), the December 2024 KN Energies acquisition of the FSRU Independence at the Klaipėda LNG terminal, and the February 2026 trilateral Altra + Synthos Green Energy + GE Vernova Hitachi Nuclear Energy assessment-phase Memorandum of Understanding on the BWRX-300 small modular reactor. 10 Regional Delivery Units corresponding to Lithuania's ten counties (Vilniaus, Kauno, Klaipėdos, Šiaulių, Panevėžio, Alytaus, Marijampolės, Tauragės, Telšių, Utenos). Distribution through Asmens kodas + SODRA + epaslaugos.lt. Anchored in the Constitution of the Republic of Lithuania (1992), the January Events of 11-13 January 1991, Vytautas the Great, Vincas Kudirka, Sąjūdis, the Baltic Way of 23 August 1989, and the Dainų šventė cooperative-cultural tradition.

Federal proposal Lithuania PCA + Energy Security Act No new Lithuanian GPM/pelno mokestis/PVM/akcizas. €300M initial state-budget appropriation. Up to €900M ILTE-coordinated lending and guarantees. Naujos kartos Lietuva coordination where consistent (€3.85B total EU allocation, 58.7% drawn). SODRA + Asmens kodas + epaslaugos.lt distribution chassis - no new admin. PDF available
The Lithuania Productive Capacity Authority and Energy Security Act establishes the Lithuanian Productive Capacity Authority (Lietuvos gamybinio pajėgumo institucija, LGPI) as a state-owned joint-stock company under the Government of the Republic of Lithuania, structured on the operational chassis of UAB ILTE (Investicijos Lietuvos ekonomikai), the Lithuanian state-owned national development bank governed by the Law on the National Development Bank of the Republic of Lithuania, founded in 2001 and renamed from INVEGA on 30 August 2024 as part of its conversion into a full national development bank with statutory capital quadrupled from €53 million to €203 million in late 2025. The Act establishes ten Regional Delivery Units corresponding to the ten Lithuanian counties (Vilniaus, Kauno, Klaipėdos, Šiaulių, Panevėžio, Alytaus, Marijampolės, Tauragės, Telšių, Utenos), issues non-transferable Productive Capacity Shares to every Lithuanian citizen ordinarily resident in the Republic of Lithuania (identified by Asmens kodas), and distributes seventy-five per cent of pooled inter-regional productive-capacity revenue annually through the existing Valstybinio socialinio draudimo fondo valdyba (SODRA) and the Elektroniniai valdžios vartai e-Government Gateway (www.epaslaugos.lt) infrastructure with target distribution date 16 February (Vasario 16-oji, Lithuanian Independence Day commemorating the 1918 Act of Independence). The Act establishes the Civic Robot Corps of Lithuania (Lietuvos Piliečių Robotų Korpusas, LPRK) as a public-good labour body with explicit eastern-frontier-county recruitment priority (Vilniaus, Alytaus, Utenos, Marijampolės). The Act elevates ENERGY SECURITY as a co-equal Title (Title VI), coordinating with Ignitis Group (state-controlled energy holding, the Government having stated August 2025 intent to gradually buy back minority shareholders), Litgrid AB (transmission system operator that led the Lithuanian side of the 9 February 2025 Baltic Synchro held at the Vilnius ceremony at 14:05 EET), ESO (Energijos skirstymo operatorius, distribution operator), KN Energies AB (operator of the Klaipėda LNG terminal and the FSRU Independence, acquired in full December 2024 from Höegh LNG after the 2014 lease, with 2025 record throughput of 34 vessels and capacity occupancy secured through 2033), and Altra (formerly SE Ignalina Nuclear Power Plant, ongoing decommissioning programme + the February 2026 trilateral assessment-phase MoU with Synthos Green Energy and GE Vernova Hitachi Nuclear Energy on the BWRX-300 small modular reactor). The Act coordinates with the Naujos kartos Lietuva (New Generation Lithuania) Recovery and Resilience Plan (€3.85 billion EU NextGenerationEU allocation, of which approximately €2.26 billion or 58.7% had been cumulatively disbursed as of January 2026), with ILTE-coordinated borrowing up to €900 million cumulative outstanding, and with the Lithuanian Armed Forces and the Riflemen's Union (Lietuvos šaulių sąjunga) for strategic-reserves coordination given Lithuania's NATO eastern-frontier position and the Suwałki corridor. The Act anchors in the Constitution of the Republic of Lithuania (1992), particularly Article 5 (institutions of authority shall serve the people), Article 46 (the State shall regulate economic activity so that it serves the general welfare of the Nation), Article 51 (right to social security), and Article 53 (state responsibility for people's health); in the January Events of 11-13 January 1991 (when 14 unarmed Lithuanian civilians were killed defending the Vilnius Television Tower and the Seimas against Soviet OMON and Spetsnaz forces, the living national-memory anchor for citizen-led defense of democratic institutions); in Vytautas the Great (Grand Duke of Lithuania 1392-1430, presided over the Grand Duchy at its territorial peak); in Vincas Kudirka (1858-1899, author of Tautiška giesmė, the Lithuanian National Hymn of 1898); in Sąjūdis (founded 3 June 1988, the Lithuanian national-liberation movement); in the Baltic Way of 23 August 1989 (the 675-kilometre human chain of two million Estonian, Latvian, and Lithuanian citizens); and in the Dainų šventė (UNESCO Intangible Cultural Heritage Lithuanian Song Festival continuous since 1924). Lietuvos bankas, ILTE (beyond authorised coordination), Ignitis Group, Litgrid, ESO, KN Energies, Altra, AB "Lietuvos geležinkeliai", AB Lietuvos paštas, the Seimas, the Government, the President of the Republic, the Constitutional Court (Konstitucinis Teismas), and all other existing Lithuanian institutions are wholly preserved. Explicit declination to establish any new Lithuanian personal income tax (GPM), corporate income tax (pelno mokestis), value added tax (PVM), excise duty (akcizas), or other Lithuanian tax of any kind.
              SEIMAS OF THE REPUBLIC OF LITHUANIA
                  Lietuvos Respublikos Seimas
                  2024-2028 Term / 2026 Session

                  ĮSTATYMO PROJEKTAS / DRAFT LAW

PATEIKĖ ________ (Seimo nariai) INTRODUCED BY ________ (Members of the Seimas)

DĖL LIETUVOS GAMYBINIO PAJĖGUMO INSTITUCIJOS IR ENERGETINIO SAUGUMO UŽTIKRINIMO

CONCERNING THE ESTABLISHMENT OF THE LITHUANIAN PRODUCTIVE CAPACITY AUTHORITY AND THE PROVISION OF ENERGY SECURITY

                  ĮSTATYMAS / A LAW

LONG TITLE / ILGAS PAVADINIMAS

LIETUVOS RESPUBLIKOS ĮSTATYMAS DĖL GAMYBINIO PAJĖGUMO INSTITUCIJOS IR ENERGETINIO SAUGUMO UŽTIKRINIMO

A LAW OF THE REPUBLIC OF LITHUANIA concerning the establishment of the Lithuanian Productive Capacity Authority (Lietuvos gamybinio pajėgumo institucija, "LGPI") as a state-owned joint- stock company on the operational chassis of UAB ILTE; the establishment of the Civic Robot Corps of Lithuania (Lietuvos Piliečių Robotų Korpusas, "LPRK") as a public-good labour body; the conferral of a Personal Productive Asset entitlement (Asmeninė Gamybinio Aktyvo Teisė) on every Lithuanian citizen ordinarily resident in the Republic, identified by Asmens kodas and enrolled through the existing Valstybinio socialinio draudimo fondo valdyba (SODRA) and Elektroniniai valdžios vartai (e-Government Gateway, www.epaslaugos.lt) infrastructure; ten Regional Delivery Units (Regioninės pristatymo institucijos) corresponding to the ten Lithuanian counties (apskritys); ENERGY SECURITY elevated as a co-equal Title coordinating with Ignitis Group, Litgrid, ESO, KN Energies, Altra, and the post- Baltic-Synchro (9 February 2025) Continental Europe Synchronous Area integration; coordination with the Naujos kartos Lietuva (New Generation Lithuania) Recovery and Resilience Plan (€3.85 billion EU NextGenerationEU allocation); explicit declination to establish any new Lithuanian personal income tax, corporate income tax, value added tax, excise duty, or other Lithuanian tax of any kind for the funding of the Authority; explicit preservation of Lietuvos bankas, ILTE (beyond authorised coordination), Ignitis Group, Litgrid, ESO, KN Energies, Altra, AB "Lietuvos geležinkeliai," AB Lietuvos paštas, and all other existing Lithuanian institutions; consistency with the Constitution of the Republic of Lithuania (1992), particularly Article 46 (the State shall regulate economic activity so that it serves the general welfare of the Nation) and Article 5 (institutions of authority shall serve the people); consistency with the philosophical heritage of Vytautas the Great, Vincas Kudirka, Sąjūdis, the Baltic Way of 23 August 1989, the January Events of 11-13 January 1991, and the Dainų šventė cooperative- cultural tradition; and provision for connected purposes.

LEGISLATIVE ROUTING NOTE

This Draft Law (Įstatymo projektas) is for introduction in the Seimas of the Republic of Lithuania during the 2024-2028 term, 2026 Session, under the legislative-initiative provisions of the Constitution (Article 68).

Suggested committee referrals following First Reading:

- Biudžeto ir finansų komitetas (Budget and Finance Committee): lead committee for fiscal provisions and ILTE coordination - Ekonomikos komitetas (Economic Affairs Committee): for productive-capacity provisions and Ignitis Group coordination - Energetikos komisija (Energy Commission): for the Energy Security Title and Litgrid + ESO + KN Energies + Altra coordination - Nacionalinio saugumo ir gynybos komitetas (National Security and Defence Committee): for the NATO eastern-frontier and strategic-reserves provisions - Socialinių reikalų ir darbo komitetas (Social Affairs and Labour Committee): for the Personal Productive Asset entitlement and SODRA coordination - Europos reikalų komitetas (European Affairs Committee): for the Naujos kartos Lietuva coordination - Žmogaus teisių komitetas (Human Rights Committee): for the constitutional-consistency provisions

Funding Architecture: Four load-bearing channels: (a) State-budget annual appropriation starting with €300 million

    for FY2027;

(b) ILTE-coordinated lending and guarantees up to €900 million

    cumulative outstanding (Article 12);

(c) Naujos kartos Lietuva coordination where consistent with

    existing Lithuanian RRP investment and reform lines
    (Article 13);

(d) Operating revenue from at-cost sales of goods produced by

    the Authority and the Civic Robot Corps of Lithuania.

No new Lithuanian taxation is established by this Act.

TITLE I - SHORT TITLE, FINDINGS, DECLARATIONS

ARTICLE 1. SHORT TITLE.

This Act may be cited as the "Lithuania Productive Capacity Authority and Energy Security Act 2026" (Lietuvos gamybinio pajėgumo institucijos ir energetinio saugumo įstatymas 2026).

ARTICLE 2. FINDINGS.

The Seimas finds:

FINDING 1 - ILTE AS INDIGENOUS LITHUANIAN CHASSIS. Lithuania already operates UAB ILTE ("Investicijos Lietuvos ekonomikai"), the state-owned national development bank governed by the Law on the National Development Bank of the Republic of Lithuania. Founded in 2001 and renamed from INVEGA on 30 August 2024 as part of its conversion into a full national development bank, ILTE provides loans, guarantees, and venture-capital investments in state-defined priority areas. In late 2025 the Ministry of Finance quadrupled ILTE's statutory capital from €53 million to €203 million to expand leverage capacity. ILTE is the indigenous Lithuanian chassis for productive-capacity financing at sovereign scale and the natural Lithuanian-institutional anchor for the Authority under this Act, consistent with the per-jurisdiction- indigenous doctrine applied across the sibling international Productive Capacity Authority adaptations.

FINDING 2 - BALTIC SYNCHRO ESTABLISHED LITHUANIAN ENERGY SOVEREIGNTY. On 9 February 2025 at 14:05 EET, with the historic ceremony held in Vilnius, Estonia, Latvia, and Lithuania jointly disconnected from the IPS/UPS Soviet-era electricity grid and the 2001 BRELL Agreement (Belarus-Russia-Estonia-Latvia- Lithuania) under Moscow's centralised dispatch, and synchronised with the Continental Europe Synchronous Area (CESA) managed by ENTSO-E. The Lithuanian role was led by Litgrid AB, which had signed a cooperation agreement with the Polish transmission operator PSE in July 2024 to prepare for the synchronisation. The Baltic Synchro is the largest single-event reorientation of national-grid governance in post-1991 Lithuanian history. Energy security is now anchored on European solidarity rather than Russian-controlled dispatch. This Act elevates Energy Security as a co-equal Title of the Authority's mandate to consolidate and extend the strategic gains of the Baltic Synchro.

FINDING 3 - KLAIPĖDA LNG TERMINAL ENERGY-SOVEREIGNTY ARC. The floating storage and regasification unit "Independence" entered service at the Klaipėda LNG terminal in 2014 under a ten-year lease from Höegh LNG. KN Energies AB (formerly Klaipėdos nafta), the state-owned terminal operator, acquired full ownership of the FSRU in December 2024. In 2025 the terminal achieved record throughput with 34 LNG vessels unloaded, and long-term capacity occupancy was secured through 2033. KN's open season of February 2026 offered 28 TWh/year from 2033-2044 in 4-TWh packages. The naming of the FSRU, the post-2022 elimination of Russian gas, and the 2024 full acquisition together establish the Lithuanian energy-sovereignty arc on which this Act's Energy Security Title is anchored.

FINDING 4 - ALTRA + BWRX-300 SMR ASSESSMENT-PHASE MOU. Altra (formal name SE Ignalina Nuclear Power Plant, rebranded late 2025), Synthos Green Energy (Poland), and GE Vernova Hitachi Nuclear Energy (United States) signed a trilateral assessment- phase Memorandum of Understanding in Washington on 25-27 February 2026 to assess the prospects of deploying the BWRX-300 small modular reactor in Lithuania. The Authority shall coordinate with Altra and with the Ministry of Energy (Energetikos ministerija) on Corps-operated services in the event the assessment progresses to deployment, while remaining deliberate that the February 2026 MoU is an assessment instrument and not a deployment agreement.

FINDING 5 - NAUJOS KARTOS LIETUVA FUNDING ALREADY IN DEPLOYMENT. The Lithuanian Recovery and Resilience Plan, "Naujos kartos Lietuva," with a total €3.85 billion EU NextGenerationEU allocation (€2.3 billion grants + €1.55 billion loans), has already disbursed cumulative payments of approximately €2.26 billion as of January 2026, representing 58.7% of the total allocation. The Authority coordinates with the existing Naujos kartos Lietuva framework where consistent with the approved Lithuanian investment and reform lines.

FINDING 6 - REPLICATION THRESHOLD AND LITHUANIAN ENGINEERING CAPACITY. Replication-threshold humanoid robotic manufacturing technology arrived in Q4 2025 through Q2 2026 (see Verification Notes). Lithuania hosts engineering capacity at Vilnius University (founded 1579, the oldest university in the Baltic region), Kaunas University of Technology, Vilnius Gediminas Technical University, Vytautas Magnus University, the Lithuanian University of Health Sciences, and Klaipėda University, and a globally competitive laser-photonics sector. Lithuania is positioned to deploy this technology under Lithuanian productive- capacity infrastructure rather than to import the goods the technology will produce.

FINDING 7 - THE JANUARY EVENTS ANCHOR THE CITIZEN-SHAREHOLDER STRUCTURE. The January Events (Sausio įvykiai, 11-13 January 1991), in which Soviet OMON and Spetsnaz forces attacked Lithuanian state institutions in Vilnius and 14 unarmed Lithuanian civilians were killed defending the Vilnius Television Tower, the Seimas, and other critical infrastructure, established the living national-memory principle that Lithuanian sovereignty is defended by Lithuanian citizens collectively. The Personal Productive Asset entitlement under this Act is the modern operational expression of that principle: every Lithuanian citizen holds a non-transferable share in Lithuanian productive- capacity infrastructure, structurally inheriting the January Events' principle that the Republic is the common endeavour of its citizens.

FINDING 8 - DAINŲ ŠVENTĖ AND THE BALTIC WAY ANCHOR COOPERATIVE CAPACITY. The Lithuanian Song Festival (Dainų šventė), continuous since 1924, inscribed on the UNESCO Representative List of the Intangible Cultural Heritage of Humanity, mobilises tens of thousands of Lithuanian singers and dancers from every municipality. The Baltic Way of 23 August 1989, a 675-kilometre human chain organised in Lithuania by Sąjūdis and joining Vilnius, Riga, and Tallinn through approximately two million Estonian, Latvian, and Lithuanian citizens, demonstrated Baltic collective civic capacity at population scale. The Civic Robot Corps of Lithuania inherits the operational precedent of these traditions: structured citizen mobilisation at population scale, anchored on cooperative-cultural memory, sustained across generations.

FINDING 9 - THE LITHUANIAN COOPERATIVE TRADITION. The first Lithuanian consumer cooperative was founded in Vilnius in 1869. The Cooperative Societies Law was passed in 1919. The Lithuanian Cooperative Union (Lietuvos kooperatyvų sąjunga, "Lietkoopsąjunga") joined the International Cooperative Alliance in 1920. "Lietūkis" agricultural cooperative union was founded in 1923. The cooperative tradition was suppressed under Soviet rule and partially revived after 1991. The Authority and the Civic Robot Corps of Lithuania coordinate with this 156-year Lithuanian cooperative lineage rather than displacing it.

FINDING 10 - VYTAUTAS THE GREAT AND VINCAS KUDIRKA ANCHOR LITHUANIAN INSTITUTIONAL MEMORY. Vytautas the Great (Vytautas Didysis, c. 1350-1430), Grand Duke of Lithuania (1392-1430), presided over the Grand Duchy of Lithuania at its territorial peak from the Baltic to the Black Sea. Vincas Kudirka (1858-1899), physician and publisher of Varpas, authored the Tautiška giesmė in 1898 (the Lithuanian National Hymn, adopted 1919, re-adopted 1989). The Authority rests on the principle that Lithuanian collective capacity, demonstrated by Vytautas's institutional reach and Kudirka's national-cultural construction, is fully sufficient to operate productive-capacity infrastructure at the scale Lithuania requires.

ARTICLE 3. DECLARATIONS.

DECLARATION 1 - PERSONAL PRODUCTIVE ASSET ENTITLEMENT. The Seimas declares that every Lithuanian citizen ordinarily resident in the Republic of Lithuania, identified by Asmens kodas, shall enjoy as a matter of statutory right under this Act a Personal Productive Asset entitlement (Asmeninė Gamybinio Aktyvo Teisė) consisting of one non-transferable Productive Capacity Share, the annual distribution of dividends from inter-regional pooled productive-capacity revenue, and access to at-cost basic-needs goods produced by the Civic Robot Corps of Lithuania.

DECLARATION 2 - EXISTING LITHUANIAN INSTITUTIONS UNAFFECTED. Nothing in this Act affects the establishment, functions, governance, or operation of:

(a) Lietuvos bankas (the central bank within the Eurosystem); (b) UAB ILTE (Investicijos Lietuvos ekonomikai), beyond the

    coordination expressly authorised by Article 12;

(c) Ignitis Group, Litgrid AB, ESO (Energijos skirstymo

    operatorius), KN Energies AB, Altra (SE Ignalina Nuclear
    Power Plant in decommissioning), AB "Lietuvos geležinkeliai,"
    AB Lietuvos paštas, and other state-owned or state-controlled
    enterprises (beyond Title V and Title VI coordination);

(d) Valstybinio socialinio draudimo fondo valdyba (SODRA),

    Valstybinė mokesčių inspekcija (VMI), Nacionalinė mokėjimo
    agentūra (NMA), the Information Society Development
    Committee, and other state agencies, beyond the coordination
    expressly authorised by this Act;

(e) The Naujos kartos Lietuva Recovery and Resilience Plan,

    beyond the coordination expressly authorised by Article 13;

(f) Lithuanian consumer and agricultural cooperatives in the

    kooperatinis judėjimas tradition;

(g) Lietuvos Raudonasis Kryžius (Lithuanian Red Cross) and

    Maisto Bankas (Lithuanian Food Bank);

(h) The Seimas, the Government of the Republic of Lithuania

    (Lietuvos Respublikos Vyriausybė), the President of the
    Republic, the Constitutional Court (Konstitucinis Teismas),
    the Supreme Court (Lietuvos Aukščiausiasis Teismas), and the
    Constitution.

DECLARATION 3 - NO NEW LITHUANIAN TAXATION. No new Lithuanian personal income tax (gyventojų pajamų mokestis, GPM), corporate income tax (pelno mokestis), value added tax (pridėtinės vertės mokestis, PVM), excise duty (akcizas), or other Lithuanian tax of any kind is established, extended, or increased by this Act.

DECLARATION 4 - MUNICIPAL AND COUNTY AUTONOMY RESPECTED. Nothing in this Act diminishes the constitutional and statutory autonomy of the 60 Lithuanian municipalities (savivaldybės) or the 10 counties (apskritys). The Regional Delivery Units under Title IV operate in coordination with, not in displacement of, municipal and county structures.

TITLE II - ESTABLISHMENT OF THE AUTHORITY

ARTICLE 4. ESTABLISHMENT.

(1) There is hereby established the Lithuanian Productive

    Capacity Authority (Lietuvos gamybinio pajėgumo institucija,
    "LGPI" or "the Authority") as a state-owned joint-stock
    company under the Government of the Republic of Lithuania,
    structured on the operational chassis of UAB ILTE and the
    framework of the Law on the National Development Bank of the
    Republic of Lithuania.

(2) The State of Lithuania, represented by the Government,

    is the sole shareholder. The Minister of Finance exercises
    the shareholder rights on behalf of the State.

ARTICLE 5. SUPERVISORY BOARD (STEBĖTOJŲ TARYBA).

(1) The Authority is supervised by a Supervisory Board of eleven

    members.

(2) Members include:

    (a) The Chair, appointed by the Government on the proposal
        of the Prime Minister, confirmed by the Seimas;
    (b) The Minister of Finance, ex officio;
    (c) The Minister of Economy and Innovation, ex officio;
    (d) The Minister of Energy, ex officio;
    (e) The Minister of Social Security and Labour, ex officio;
    (f) One member designated by the Chair of the ILTE
        Supervisory Board, as the standing interface between the
        Authority and ILTE;
    (g) One member designated by Ignitis Group as the standing
        energy-sector interface;
    (h) Three members representing the Lithuanian cooperative
        sector, Lithuanian trade unions (Lietuvos profesinių
        sąjungų konfederacija, LPSK), and the Lithuanian
        employers' confederation (Lietuvos pramonininkų
        konfederacija, LPK);
    (i) One member representing Lithuanian civil society and the
        academic community (Vilnius University / Kaunas
        University of Technology / Vytautas Magnus University /
        Vilnius Gediminas Technical University).

ARTICLE 6. MANAGEMENT BOARD (VALDYBA).

(1) The Authority is managed by a Management Board of five

    members, appointed and recalled by the Supervisory Board.

(2) The Board includes a Chairman (Valdybos pirmininkas), a

    Vice-Chairman for Productive Capacity, a Vice-Chairman for
    Energy Security and Baltic Synchro Coordination, a Vice-
    Chairman for Regional Delivery and Civic Robot Corps
    Operations, and a Vice-Chairman for Finance and ILTE
    Coordination.

ARTICLE 7. POWERS OF THE AUTHORITY.

The Authority has the power to:

(a) Establish, capitalise, and govern ten Regional Delivery

    Units (Regioninės pristatymo institucijos) under Article 17;

(b) Issue Productive Capacity Shares under Article 14; (c) Acquire, hold, manage, lease, sell, and dispose of property

    including replication-threshold robotic manufacturing
    equipment;

(d) Enter contracts with the Government, ministries, ILTE,

    Ignitis Group, Litgrid, ESO, KN Energies, Altra, Lithuanian
    municipalities, Lithuanian cooperatives, the European
    Commission Naujos kartos Lietuva coordination, and private
    vendors;

(e) Coordinate with ILTE under Article 12 for borrowing and

    guarantees up to €900 million cumulative outstanding;

(f) Coordinate with the Naujos kartos Lietuva plan under

    Article 13;

(g) Distribute Productive Capacity Dividends under Article 15

    through the existing SODRA and epaslaugos.lt infrastructure;

(h) Charter the Civic Robot Corps of Lithuania (Lietuvos

    Piliečių Robotų Korpusas) under Title V;

(i) Coordinate with Ignitis Group, Litgrid, ESO, KN Energies,

    and Altra under Title VI;

(j) Issue regulations and rules within the scope of its mandate.

TITLE III - FUNDING ARCHITECTURE

ARTICLE 8. PRINCIPLES OF FUNDING.

Four load-bearing channels per the Legislative Routing Note; no new Lithuanian taxation.

ARTICLE 9. NO NEW TAXATION.

No new Lithuanian gyventojų pajamų mokestis (GPM), pelno mokestis, pridėtinės vertės mokestis (PVM), akcizas, or other Lithuanian tax of any kind is established by this Act.

ARTICLE 10. INITIAL APPROPRIATION.

(1) For the financial year 2027 there is appropriated from the

    Lithuanian state budget the sum of €300 million for the
    establishment of the Authority, scaled to the Lithuanian
    population of approximately 2.87 million on a per-capita
    basis comparable to the Latvian programme appropriation.

(2) Subsequent annual appropriations shall be made in the

    ordinary annual budget Law.

ARTICLE 11. STATE-TREASURY SHAREHOLDING.

The State of Lithuania subscribes one hundred per cent (100%) of the initial share capital of the Authority in the amount of €300 million as the founder's contribution under Article 10.

ARTICLE 12. ILTE COORDINATION.

(1) The Authority and UAB ILTE shall enter a Coordination

    Agreement (Bendradarbiavimo sutartis) within twelve months
    of the establishment of the Authority, providing for ILTE
    loans, guarantees, and venture-capital co-investment in
    Authority-operated productive-capacity facilities up to a
    cumulative outstanding principal of €900 million.

(2) Coordination shall be consistent with the Law on the

    National Development Bank of the Republic of Lithuania and
    with ILTE's operational strategy following the late-2025
    quadrupling of statutory capital from €53 million to €203
    million.

(3) The Authority does not direct, control, or modify ILTE's

    operations.

ARTICLE 13. NAUJOS KARTOS LIETUVA COORDINATION.

(1) The Authority may receive co-financing from the Naujos

    kartos Lietuva (New Generation Lithuania) Recovery and
    Resilience Plan (€3.85 billion total EU NextGenerationEU
    allocation, of which approximately €2.26 billion or 58.7%
    had been cumulatively disbursed as of January 2026) where
    consistent with the Lithuanian investment and reform lines
    approved by the European Commission and the Council of the
    European Union.

(2) The Authority does not displace any existing Naujos kartos

    Lietuva investment or reform line.

ARTICLE 14. PRODUCTIVE CAPACITY SHARES.

(1) The Authority shall issue Productive Capacity Shares

    (Gamybinio pajėgumo akcijos) as follows:
    (a) ONE Productive Capacity Share to every Lithuanian
        citizen ordinarily resident in the Republic of Lithuania
        on the effective date of this Act, identified by Asmens
        kodas;
    (b) ONE Productive Capacity Share to every person born
        thereafter to an ordinarily-resident parent, upon birth
        registration;
    (c) ONE Productive Capacity Share to every person acquiring
        ordinary residence in the Republic of Lithuania
        thereafter and obtaining an Asmens kodas, upon
        completion of a one-year ordinary-residence period.

(2) Productive Capacity Shares are non-transferable.

(3) A Share may be inherited by an ordinarily-resident

    Lithuanian citizen through ordinary inheritance law.

(4) ONE PERSON, ONE SHARE.

ARTICLE 15. ANNUAL DISTRIBUTION.

(1) Seventy per cent (70%) of all productive-capacity revenue

    received by each Regional Delivery Unit under Title IV
    shall be remitted to the Authority for inter-regional
    pooling. Each Regional Delivery Unit retains the remaining
    thirty per cent (30%) for regional-level operations.

(2) Seventy-five per cent (75%) of the inter-regional pool

    shall be distributed annually to Productive Capacity
    Shareholders, equally per share, through the existing SODRA
    and epaslaugos.lt infrastructure.

(3) The remaining twenty-five per cent (25%) is retained by

    the Authority for operating reserves, ILTE-coordinated debt
    repayment, and expansion capital.

(4) The annual distribution shall be made on a date determined

    by the Authority with a target date of 16 February (Vasario
    16-oji, Lithuanian Independence Day, commemorating the
    1918 Act of Independence) in each year, symbolically
    connecting the Personal Productive Asset entitlement to
    Lithuanian constitutional sovereignty.

TITLE IV - TEN REGIONAL DELIVERY UNITS

ARTICLE 16. TEN REGIONAL DELIVERY UNITS.

(1) The Authority establishes ten Regional Delivery Units

    (Regioninės pristatymo institucijos, "RPI") corresponding
    to the ten Lithuanian counties (apskritys):
    (a) RPI Vilniaus (Vilnius county, capital county, eastern-
        frontier county bordering Belarus, strategic-security
        priority);
    (b) RPI Kauno (Kaunas county, central Lithuania);
    (c) RPI Klaipėdos (Klaipėda county, western Lithuania,
        hosts the Klaipėda LNG terminal and the only Lithuanian
        Baltic Sea port);
    (d) RPI Šiaulių (Šiauliai county, northern Lithuania);
    (e) RPI Panevėžio (Panevėžys county, north-central
        Lithuania);
    (f) RPI Alytaus (Alytus county, southern Lithuania,
        Belarus-border county);
    (g) RPI Marijampolės (Marijampolė county, south-western
        Lithuania, Suwałki-corridor county at the Polish border,
        NATO strategic chokepoint - additional priority);
    (h) RPI Tauragės (Tauragė county, western Lithuania);
    (i) RPI Telšių (Telšiai county, north-western Lithuania);
    (j) RPI Utenos (Utena county, north-eastern Lithuania,
        Belarus-border county).

(2) Each RPI is administered by a Director appointed by the

    Authority Board with the advice of the relevant county-level
    administration and the relevant municipal leaderships.

(3) Each RPI operates within the legal framework of the

    Lithuanian municipalities within the county, coordinated
    through the Lithuanian Association of Local Authorities
    (Lietuvos savivaldybių asociacija, LSA).

TITLE V - CIVIC ROBOT CORPS OF LITHUANIA

ARTICLE 17. ESTABLISHMENT.

(1) There is hereby established within the Authority a public-

    good labour body to be known as the "Civic Robot Corps of
    Lithuania" (Lietuvos Piliečių Robotų Korpusas, "LPRK" or
    "the Corps").

(2) The Corps operates replication-threshold robotic

    manufacturing equipment for at-cost basic-needs goods
    production and other service lines.

ARTICLE 18. SERVICE LINES.

The Corps shall operate:

(a) At-cost goods production and distribution (coordinating

    with the Food, Resource, and Commodity Assurance Programme
    under the sibling Lithuania Food Assurance Act);

(b) Eastern-frontier-priority distribution in Vilniaus, Alytaus,

    Utenos, and Marijampolės counties given Lithuania's NATO
    eastern-frontier position and the Suwałki corridor;

(c) Coordination with Ignitis Group for Corps-operated

    deployment and maintenance services in support of the
    Lithuanian renewable-energy build-out and the Kaunas
    Hydroelectric Power Plant + Kruonis Pumped Storage Plant
    portfolio;

(d) Coordination with Litgrid AB for Corps-operated grid-

    deployment and maintenance services in support of the
    post-Baltic-Synchro Lithuanian grid integration with CESA;

(e) Coordination with KN Energies AB for Corps-operated

    maintenance and operating services at the Klaipėda LNG
    terminal and FSRU Independence;

(f) Coordination with Altra for Corps-operated decommissioning-

    support services at the Ignalina site and, in the event the
    Altra-SGE-GVH BWRX-300 SMR assessment-phase MoU progresses
    to deployment, Corps-operated services in support of any
    deployment-phase work;

(g) Coordination with the Lithuanian agricultural cooperative

    sector for Corps-operated value-added processing of
    Lithuanian-grown agricultural output;

(h) Healthcare-supply-chain logistics coordination with the

    Lithuanian National Health Insurance Fund (Valstybinė ligonių
    kasa, VLK) and Lithuanian hospital networks;

(i) Strategic-reserves coordination with the Lithuanian Armed

    Forces (Lietuvos kariuomenė) and the Riflemen's Union
    (Lietuvos šaulių sąjunga, LŠS) given Lithuania's NATO
    eastern-frontier position;

(j) Coordination with the Lithuanian Song Festival (Dainų

    šventė) infrastructure for cooperative-cultural-capacity
    expansion in Corps service-line operations.

ARTICLE 19. HUMAN WORKFORCE.

(1) The Corps employs a human workforce of Lithuanian

    ordinarily-resident citizens, with county preference and
    explicit eastern-frontier-county recruitment priority
    (Vilniaus, Alytaus, Utenos, Marijampolės).

(2) The Corps shall:

    (a) Maintain a wage floor of 120% of the Lithuanian
        national minimum monthly wage (minimalioji mėnesinė
        alga, MMA);
    (b) Provide social-insurance contributions through SODRA at
        the standard employer-side rate;
    (c) Coordinate with Lithuanian vocational secondary
        education and the Lithuanian university sector for
        apprenticeship pipelines;
    (d) Provide explicit pathways from Corps employment to the
        Lithuanian civil service (Valstybės tarnyba), to the
        Lithuanian Armed Forces, to the Riflemen's Union, and to
        state-owned enterprises.

TITLE VI - ENERGY SECURITY AND BALTIC SYNCHRO COORDINATION

ARTICLE 20. ENERGY SECURITY AS A CO-EQUAL MANDATE.

The Seimas declares that ENERGY SECURITY of the Republic of Lithuania is a co-equal Title of the Authority's mandate alongside productive capacity and the Civic Robot Corps. The structural reasons are:

(a) The 9 February 2025 Baltic Synchro disconnection from BRELL

    and synchronisation with the Continental Europe Synchronous
    Area (CESA), with the historic ceremony held in Vilnius,
    consolidated Lithuanian energy sovereignty; sustaining and
    extending those gains is a permanent national priority;

(b) The Klaipėda LNG terminal and the FSRU Independence,

    wholly owned by KN Energies AB since December 2024,
    constitute the Lithuanian natural-gas independence
    infrastructure; sustaining and extending the terminal's
    capacity is a national priority;

(c) The Altra-SGE-GVH BWRX-300 small modular reactor

    assessment-phase MoU of February 2026 establishes the
    Lithuanian nuclear-policy trajectory under post-Ignalina
    decommissioning conditions;

(d) NATO eastern-frontier security context requires energy

    resilience independent of any Russian-controlled
    infrastructure, including the Belarusian and Kaliningrad
    borders.

ARTICLE 21. IGNITIS GROUP COORDINATION.

(1) The Authority and Ignitis Group (AB Ignitis grupė) shall

    enter a Coordination Agreement within twelve months of the
    Authority's establishment, providing for Corps-operated
    deployment and maintenance services for Ignitis Group's
    renewable-energy portfolio, hydroelectric assets including
    the Kaunas Hydroelectric Power Plant and the Kruonis Pumped
    Storage Plant, and battery-energy-storage build-out
    including the 582 MWh Rolls-Royce BESS contracted September
    2025.

(2) The Authority does not direct, control, or modify Ignitis

    Group operations. The Government's stated August 2025
    intent to gradually buy back Ignitis Group minority shares
    is independent of this Act and is not affected by it.

ARTICLE 22. LITGRID AND ESO COORDINATION.

(1) The Authority and Litgrid AB shall enter a Coordination

    Agreement providing for Corps-operated grid-deployment and
    maintenance services in support of the post-Baltic-Synchro
    Lithuanian transmission grid and the CESA integration
    through LitPol Link, NordBalt, and Estlink 1/2
    interconnectors.

(2) The Authority and ESO (Energijos skirstymo operatorius)

    shall enter a parallel Coordination Agreement providing
    for Corps-operated distribution-grid services.

(3) The Authority does not direct, control, or modify Litgrid

    or ESO operations.

ARTICLE 23. KN ENERGIES AND KLAIPĖDA LNG TERMINAL COORDINATION.

(1) The Authority and KN Energies AB shall enter a Coordination

    Agreement providing for Corps-operated terminal-operation
    and maintenance support services at the Klaipėda LNG
    terminal and the FSRU Independence.

(2) Coordination shall reflect the Lithuanian energy-sovereignty

    arc of the FSRU Independence: 2014 service commencement
    under lease, 2022 elimination of Russian gas, December 2024
    KN acquisition of full FSRU ownership, 2025 record
    throughput, February 2026 open season for 2033-2044 capacity.

ARTICLE 24. ALTRA AND BWRX-300 SMR COORDINATION.

(1) The Authority and Altra shall enter a Coordination Agreement

    providing for Corps-operated decommissioning-support
    services at the Ignalina site, including the ongoing
    near-surface low/intermediate radioactive-waste repository
    construction commenced May 2025 and the reactor channel
    dismantling at the second unit scheduled to begin end-2026.

(2) The Authority shall coordinate with Altra, the Ministry of

    Energy, Synthos Green Energy (Poland), and GE Vernova
    Hitachi Nuclear Energy (United States) on Corps-operated
    services in the event the trilateral assessment-phase
    Memorandum of Understanding signed in Washington on 25-27
    February 2026 progresses to deployment.

(3) The February 2026 MoU is recognised as an assessment-phase

    instrument; nothing in this Act commits the Republic of
    Lithuania to any deployment decision.

ARTICLE 25. STRATEGIC RESERVES AND NATO EASTERN-FRONTIER

            SECURITY.

(1) Recognising Lithuania's NATO eastern-frontier position and

    the Suwałki corridor, the Authority shall maintain strategic
    reserves of basic-needs goods, distributed across the ten
    Regional Delivery Units with priority allocation to the
    eastern-frontier counties of Vilniaus, Alytaus, Utenos, and
    Marijampolės, sufficient to support Lithuanian civil-defence
    requirements consistent with the Ministry of National
    Defence (Krašto apsaugos ministerija) and Lithuanian Armed
    Forces planning.

(2) The strategic reserves are managed in coordination with the

    Lithuanian Armed Forces and the Riflemen's Union (Lietuvos
    šaulių sąjunga).

TITLE VII - IMPLEMENTATION PHASES

ARTICLE 26. FOUR-PHASE IMPLEMENTATION.

PHASE I - ESTABLISHMENT (Months 0-12). Authority established; Supervisory Board and Management Board appointed; ten RPIs seated; Productive Capacity Shares issued via Asmens kodas + SODRA + epaslaugos.lt; ILTE Coordination Agreement signed.

PHASE II - INITIAL CORPS OPERATIONS (Months 12-36). Civic Robot Corps of Lithuania commences operations in Vilniaus and Klaipėdos counties (capital + port and LNG terminal infrastructure); Ignitis Group + Litgrid + ESO + KN Energies + Altra Coordination Agreements signed; initial ILTE-coordinated borrowing up to €450 million drawn.

PHASE III - LITHUANIA-WIDE OPERATIONS (Months 36-72). Corps operations extend to all ten RPIs with priority deployment in the eastern-frontier counties (Vilniaus, Alytaus, Utenos, Marijampolės). Coordination with the Altra-SGE-GVH BWRX-300 assessment may have progressed to deployment-phase coordination under separate Government decision. Annual Productive Capacity Dividend in regular distribution on 16 February.

PHASE IV - STEADY-STATE OPERATING POSTURE (Month 72 onward). Authority reaches steady-state. No sunset.

TITLE VIII - GENERAL PROVISIONS

ARTICLE 27. EFFECTIVE DATE.

(1) Articles 1 (Short Title) and 27 (Effective Date) take

    effect on the date this Act is promulgated in the Teisės
    aktų registras (Register of Legal Acts).

(2) Remaining provisions take effect on 1 July 2027.

(3) The Government shall issue implementing regulations

    (Vyriausybės nutarimai) within 120 days of promulgation.

ARTICLE 28. SEVERABILITY.

If any provision is held invalid by the Constitutional Court (Konstitucinis Teismas), the invalidity does not affect other provisions that can be given effect.

ARTICLE 29. CONSTITUTIONAL CONSISTENCY.

This Act is enacted consistent with the Constitution of the Republic of Lithuania (1992), particularly Article 5 (institutions of authority shall serve the people), Article 46 (the State shall regulate economic activity so that it serves the general welfare of the Nation), Article 51 (right to social security), and Article 53 (the State shall take care of people's health); and consistent with the philosophical heritage of Vytautas the Great, Vincas Kudirka, Sąjūdis, the Baltic Way of 23 August 1989, the January Events of 11-13 January 1991, and the Dainų šventė cooperative-cultural tradition.

ARTICLE 30. INTERPRETATION.

In this Act -

"the Authority" or "LGPI" means the Lithuanian Productive Capacity Authority established under Article 4;

"the Corps" or "LPRK" means the Civic Robot Corps of Lithuania established under Article 17;

"RPI" means a Regional Delivery Unit established under Article 16;

"ILTE" means UAB ILTE (Investicijos Lietuvos ekonomikai), the Lithuanian state-owned national development bank;

"Ignitis Group" means AB Ignitis grupė;

"Litgrid" means Litgrid AB;

"ESO" means Energijos skirstymo operatorius UAB;

"KN Energies" means KN Energies AB (formerly Klaipėdos nafta);

"Altra" means SE Ignalina Nuclear Power Plant (rebranded Altra late 2025);

"SODRA" means Valstybinio socialinio draudimo fondo valdyba;

"Naujos kartos Lietuva" means the Lithuanian Recovery and Resilience Plan under the EU Recovery and Resilience Facility;

"Baltic Synchro" means the 9 February 2025 synchronisation of the Estonian, Latvian, and Lithuanian electricity grids with the Continental Europe Synchronous Area, ceremony held in Vilnius, managed by ENTSO-E;

"county" means a Lithuanian apskritis (one of the ten: Vilniaus, Kauno, Klaipėdos, Šiaulių, Panevėžio, Alytaus, Marijampolės, Tauragės, Telšių, or Utenos);

"kooperatinis judėjimas" means the Lithuanian cooperative movement;

"ordinarily resident" has the meaning given by Lithuanian residence law.

- END -